Design and project management of a new battery powered mobile hoist for lifting operations on the charge hall floor at Torness nuclear power station.
Mobile hoist assembly in Autodesk Inventor
As the project engineer my responsibilities included design calculations, manufacturing drawings, testing and documentation including the O&M manual and technical file.
Mobile hoist assembly in Autodesk Inventor
Testing the mobile hoist
Testing the mobile hoist
Mobile hoist on site in the Torness charge hall